BAGGAGE HANDLING SYSTEM FOR FITSAIR | 45 meters

BAGGAGE HANDLING SYSTEM FOR FITSAIR | 45 meters

• Developing Mechanical Model of Baggage Handling System with Key Components at LOD 350.
• Developing Architectural Model with Counters and Other Key Elements with Realistic Materials.
• Developing Structural Model with Special Waffle Slab Arrangement.
• Developing Electrical Cable Trunking and Key Electrical Families.
• Clash Detection and System Coordination in Navisworks.
• Developing Realistic Walkthrough Video All the Correct Materials, Entourage, Special Animations and Lighting.
• Developing Required Layout Drawings with Annotations.

Category
BIM
Date
December 13, 2024
Tags
Sri Lanka
Follow Us